Gemini 4 Neon: reasoning benchmarks — What the published evidence supports
The table shows provider-reported scores under the settings described by Google. The displayed rows have different tasks and denominators. Keep the benchmark name and version with any number you quote. If a score is missing, leave it blank in the comparison and use the shared rows as the basis for interpretation.
For the schedule fixture, give deliveries and bookings in a small table and describe constraints in plain language. Keep at least one case where there is no valid solution under the original deadline. A good response should surface the contradiction and name the smallest relevant change a stakeholder could authorize.
Sources: Google’s Neon announcement · DeepMind’s Neon model card
Define the decision and a passing result
A planner must revise a schedule after a supplier changes its delivery date.
Write one line that explains what a reviewer must see to accept the result. For this case, check constraint validity and recovery from changed assumptions. Keep the success rule in the worksheet next to the input revision. A person reading the record should be able to tell why an output passed without being told which model produced it.
Use a routine version of the schedule revision case first. Then change one condition to make the easy answer invalid. The example to look out for is this: the proposal satisfies delivery but silently double-books the installation team. Write the expected response before trying either candidate. Use a second, held-out input if you adjust the prompt after looking at the first result.
Prepare the evaluation in a sandbox or copy of the working files. Preserve the original form of the input alongside any text extraction, summary, or manual cleanup. If preprocessing is necessary, repeat it for each candidate and record whether a human or a tool performed it. Report the work required to prepare the input alongside the work required to approve the output.

Run the example on a fixed input
Require the final schedule, a list of binding constraints, and a valid fallback for an impossible deadline.
On the second turn, withdraw a resource the model already assigned. Keep the acceptance rule constant and check whether the schedule and all dependent notes are revised. This reveals stale assumptions that would stay hidden in a one-shot benchmark. Record invalid outputs as invalid even if the explanation of the problem is fluent.
For the initial request, use this instruction as a starting point: “Require the final schedule, a list of binding constraints, and a valid fallback for an impossible deadline. Explain which input supports each consequential claim or calculation. List any required checks you could not perform, and state what would let a reviewer finish the job.” Keep the instruction with the saved run so reviewers can distinguish a missed requirement from an unstated expectation.
Save the first response, the correction history, and the final output. Record which important claims or actions a reviewer found unsupported. If the task relies on a tool, preserve the relevant tool result next to the output. A result awaiting a missing source belongs in a separate status from an accepted result. Include timeouts and abandoned attempts in the sample, since excluding them changes the denominator.
Have a second reviewer grade at least the ambiguous cases before resolving disagreements. Start with the answer key and the actual artifact. For an unexpected but valid answer, update the rubric in a new version and either regrade the existing sample or reserve the change for a later round. Preserve the original results so improvements in the scoring rules remain visible.

Read the result and investigate misses
A spreadsheet or simple constraint checker can validate overlaps more reliably than a reviewer reading a long narrative. Test feasibility first, then score preference-sensitive choices such as minimizing idle time. If your team cares about changing a plan in response to new information, report that metric apart from the score on the original plan.
Use a small table with one row per task and candidate. Record the rubric outcome, severe defects, time to first response when it matters, time to an accepted output, and number of follow-up turns. Mark runs in which the tools or instructions differed. For repeated runs of the same task, retain every outcome and note whether the same issue returned. Treat a strong result on one sample as a reason to test it again on an independent case.
The proposal satisfies delivery but silently double-books the installation team.
Review critical failures on their own. Put errors with clear evidence in one column and disagreements about wording or preferences in another. If the trial produces a mixture of successes and failures, report cases where the workflow can already be used, along with the controls it needs. A single average can hide a serious error that occurs on a small class of tasks.
Decide whether to adopt the workflow
Grade the final artifact against explicit rules instead of assessing the length of its explanation.
A trial can show that one candidate performed better on your task without establishing that it wins on every task in the same category. Keep the original inputs and version information, and record which cases fall outside the trial. If both candidates fail the same requirement, look at what the inputs or tools expose before concluding that a larger model would resolve it.
Name the person responsible for reviewing the result and the date you will revisit it. Keep one accepted and one rejected sample as references. A future model revision, revised billing entry, or change in the input mix is a good reason to run the checks again. When the evidence supports only a narrow change, document the task that qualifies and keep the existing process for the rest.
Conclusion
Separate question answering from executing a workflow with changing constraints. Google reports 71.3% for Neon on HLE-Diamond and 75.8% on Agents’ Last Exam v1.1 under different testing conditions.
Grade the final artifact against explicit rules instead of assessing the length of its explanation.
Frequently asked questions
What should I check first for reasoning benchmarks?
Require the final schedule, a list of binding constraints, and a valid fallback for an impossible deadline.
How should I handle a failed example?
The proposal satisfies delivery but silently double-books the installation team. Record the discrepancy and the relevant input or usage record. Require another run on a fresh case before changing the decision.
Can I apply these findings to another setup?
A trial can show that one candidate performed better on your task without establishing that it wins on every task in the same category. Keep the original inputs and version information, and record which cases fall outside the trial. If both candidates fail the same requirement, look at what the inputs or tools expose before concluding that a larger model would resolve it.
Keep reading
Gemini 4 Neon: research and citation review
Gemini 4 Neon: research and citation review. Assess published benchmarks and use a practical checklist to verify results on your own tasks.
Read article Gemini 4 NeonGemini 4 Neon: spreadsheet analysis review
Gemini 4 Neon: spreadsheet analysis review. Assess published benchmarks and use a practical checklist to verify results on your own tasks.
Read article Gemini 4 NeonGemini 4 Neon: switching from Gemini 3.5 Flash
Gemini 4 Neon: switching from Gemini 3.5 Flash. Compare the options on the same inputs and use a workflow checklist to decide when to switch.
Read article