Start with the decision, not the technology
An architecture decision record should explain why a particular option fits a particular situation. A list of fashionable technologies does not answer that question. Define the decision in one sentence, such as whether an internal reporting job should run synchronously or use a queue.
Anthropic describes Claude Opus 5.5 as a model for long-running coding and knowledge work, including complex systems engineering. That positioning makes it a candidate for this drafting workflow, not proof that its recommendation will be correct. See the official model overview in Sources.

Build a short evidence packet
Give each input an identifier: C1 for a requirement, M1 for a measurement, and A1 for an assumption. Include the expected workload, data sensitivity, reliability requirements, existing infrastructure, and operational ownership. If the peak workload is unknown, mark it unknown instead of choosing a plausible number.
Illustrative input: the reporting job currently takes 45 seconds; the interface team wants an immediate acknowledgement; operations has not agreed to support another service. These are fictional constraints for the example, not an Orlino case study. For decisions that need repeated reviews, use a Claude Project to keep the evidence and working context together.
Request an option table and a conditional decision
Ask for options that can actually be operated by your team. Include maintaining the current approach if that is viable. The model should show which requirement each option satisfies and where evidence is missing.
Example prompt:
Draft an architecture decision record using only this evidence packet. Include Context, Options, Decision, Consequences, and Revisit triggers. Compare a synchronous job, a managed queue, and improving the current process. Cite input IDs for factual claims. Mark unsupported estimates as assumptions. If the evidence does not justify a winner, list the measurements needed to decide.
Read the draft as a reviewer
For the fictional example, immediate acknowledgement and completed reporting are different outcomes. A queued design could acknowledge a request before the report finishes. The decision record must state how users learn that the job failed and who investigates stuck work.
Inspect whether the recommendation relies on an unsupported service-level target. Ask for an explicit operational cost: which team monitors retries, duplicate jobs, and the dead-letter queue? A technically attractive option may remain unsuitable until ownership is agreed. An incident postmortem workflow can help structure the review of failure handling and operational responsibility.
Make the decision reversible where possible
Before approval, add a migration boundary and a trigger for reconsideration. A trigger should identify an observable condition, such as job duration exceeding an agreed threshold, rather than a vague statement that the system grows. If the decision requires a system change, turn it into a code migration plan with explicit boundaries and acceptance checks.
Keep the approved record with the evidence and the reviewer’s name. Treat future model suggestions as proposed amendments. Do not let a revised draft silently change an already approved decision.
Using this workflow in Orlino
If Claude Opus 5.5 is available in your Orlino account, start with a small evidence packet and request the record as text. Confirm file input and any connected development tools separately. This draft does not confirm that Orlino offers this exact model or can inspect your codebase.
For the next review, keep the same packet and ask whether new evidence changes the decision. That gives the conversation a clear purpose without pretending the model owns the architecture.
Frequently asked questions
Should I let the model choose the architecture?
Use its output as a proposal. The accountable team should check assumptions, operating costs, and constraints before approving a decision.
What if we have no reliable workload estimate?
Record the gap and design a measurement. Do not turn an invented estimate into a decision premise.
Sources
Provider information is separate from Orlino account access and plan terms.